Regulatory CMC Change Control Simulator
Simulate pharmaceutical manufacturing changes, calculate variation classifications, and determine eCTD Module 3 filing impact in seconds.
Select a Proposed CMC Variation
Explore how changes in synthesis, manufacturing facilities, or specifications impact regulatory submissions.
Active Variation Assessment
Transfer of Drug Product Manufacturing to Secondary Site
Relocation of aseptic filling and lyophilisation operations to an alternate EU/US GxP-inspected facility.
Official Classification
Variation Type II (Major)
Target Timeline: 60 to 90 Days Clock
Impacted eCTD Module 3 Sections
3.2.P.3.1 (Manufacturer)
3.2.P.3.3 (Manufacturing Process)
3.2.P.3.5 (Process Validation)
3.2.P.8.1 (Stability Summary)
Mandatory Stability & Analytical Data
3-6 months accelerated & long-term stability data from minimum 3 consecutive commercial scale batches.
Conforms strictly with ICH Q1A(R2) stability testing and ICH Q5C biological product standards.
Reference: European Commission Variation Guideline (2013/C 223/01) and FDA 21 CFR 314.70.Discuss Your CMC Requirements